CT Sim+ - The CT Sim+, 3-Arm, Green Laser is used in the - GAMMEX, INC.

Duns Number:157308230

Device Description: The CT Sim+, 3-Arm, Green Laser is used in the simulation stage of radiation therapy to pr The CT Sim+, 3-Arm, Green Laser is used in the simulation stage of radiation therapy to prepare a patient for treatment. The lasers can be moved to a point that defines the radiation treatment isocenter or can be used to define the center of the CT imager. The Gammex CT Sim+ is intended to read laser positioning coordinates in a DICOM or Gammex specified software format. Typically the coordinates are calculated by a Radiation Therapy Treatment Planning System (RTPS) or CT Virtual Simulation System.

Want to know more about this Product? Request more information now!


More Product Details

Catalog Number

805652

Brand Name

CT Sim+

Version/Model Number

CT Sim+

Device Commercial Distribution Status

In Commercial Distribution

Commercial Distribution End Date

-

Issuing Agency

In HIBCC

Product Characteristics

MRI safety Status

Labeling does not contain MRI Safety Information

Device required to be labeled as containing natural rubber latex or dry natural rubber (21 CFR 801.437)

-

Device labeled as "Not made with natural rubber latex"

-

For Single-Use

-

Prescription Use (Rx)

Yes

Over the Counter (OTC)

-

Kit

-

Combination Product

-

Human Cell, Tissue or Cellular or Tissue-Based Product (HCT/P)

-

FDA Premarket Submission

-

Product Code Details

Product Code

IWE

Product Code Name

Monitor, Patient Position, Light-Beam

Device Record Status

Public Device Record Key

4cd69d13-a51b-4a21-a671-c7513bd4f99b

Public Version Date

October 02, 2019

Public Version Number

3

DI Record Publish Date

September 23, 2016

Additional Identifiers

Package DI Number

None

Quantity per Package

-

Contains DI Package

-

Package Discontinue Date

-

Package Status

-

Package Type

-

"GAMMEX, INC." Characteristics
Device Class Device Class Description No of Devices
1 A medical device with low to moderate risk that requires general controls 72